Also include is a connection with the existing bridge that currently spans the Hume FWY, and used to connect across the road the bowls club side of the Railway Place. Instead, I have connected it directly to the departure lounge area, however this could potentially cause security issues that need to be resolved, as it bypasses the ticketing system.
Friday, 11 November 2011
Public Transit Station Development
Also include is a connection with the existing bridge that currently spans the Hume FWY, and used to connect across the road the bowls club side of the Railway Place. Instead, I have connected it directly to the departure lounge area, however this could potentially cause security issues that need to be resolved, as it bypasses the ticketing system.
Labels:
Design Development
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment